ichthys-project-darwin
Ichthys LNG Project CCP-2 – Downer
(February 2018 – Current)
Process Chemicals has been engaged by Downer & JKC to conduct pre-commissioning scope of work, undertaking lube oil flushing & chemical cleaning activities on all major pipework & cooling systems for the Combined Cycle Power Plant (CCP-2) elements. These include: GE vendor supplied Gas turbine generators (GTG’s) & Steam turbine generators (STG’s) along with Boiler feed & condenser equipment. Project timeline is approximately 12 months.
22467476_10210202868283639_8036690085153215968_o
Woodside Energy GWF#2 Subsea Manifolds
(September 2017 – October 2017)
Site Integration Testing of 5 x Subsea Manifold including Flushing, Hydrotesting & Preservation  
No image available
Quadrant Energy Greater Eastern Spar Subsea Spooling
(September 2017)
Flooding, Hydrotesting and Preservation of 2 x 6” Jumper Spools
1
Woodside Energy GWF#2 Subsea Manifolds
(March 2017 – October 2017)
Factory Acceptance Testing of 5 x Subsea Manifold including Flushing & Hydrotesting