Process Chemicals will work closely and integrated with our clients to identify and develop test packs required for tender packages.
Test Packs aide the client with the identification and tracking of piping systems against P&ID and Isometric Drawings and can record information to document significant construction completion targets.
The test pack development is based on piping systems, spec changes, piping material and mediums and shall conform to the parameters and requirements set out in the project specifications.
Test packs may be used to include and record other construction or commissioning activities, such as flushing, air drying, chemical cleaning or purging.
Our test pack format and data base identification system can be used by the client to develop fully integrated Work Packs inclusive of all installation activities for the mechanical completion and hand over of piping systems.
Our test pack management system allows the client to follow the progress of piping systems and aide in the scheduling of impending piping system installations.